My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-29-2003 Bayport Expansion Review Committee Meeting
LaPorte
>
.Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2003
>
05-29-2003 Bayport Expansion Review Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 5:23:42 PM
Creation date
7/31/2025 10:27:08 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
5/29/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />e <br /> <br />e <br /> <br />standards through its environmental management system (EMS) at the <br />Barbours Cut Terminal and the Central Maintenance Facility. <br />. The PHA's design for the Bayport facility includes several <br />.' mitigations f0r environmental impacts. For example, the use of clean <br />fuel and clean engine technology will help reduce air emissions. The <br />PHA also has committed to help fund several local transportation <br />projects in the Bayport area in an effort to increase the safety a~d <br />efficiency of the local transportation network while reducing <br />congestion and air pollution. A three-mile long buffer zone around the <br />facility will include a landscaped sight and sound berm that will be <br />20 feet tall. The buffer zone also includes part of an extensive <br />stormwater collection system that will protect Galveston Bay. Lighting <br />systems designed to use black light poles and specially designed <br />fixtures will limit night-time impacts. The PHA's Bayport plan also <br />involves jurisdictional wetland replacement at a ratio of more than <br />three to one to increase the habitats available for fish, waterfowl <br />and other coastal wildlife. Furthermore, the beneficial use of dredged <br />material will create an additional 200 acres of inter-tidal marsh. <br />"The Port Authority has drawn on expertise developed in other <br />ports around the world to make the proposed Bayport facility <br />environmentally sound," stated Chairman Edmonds. "We will continue to <br />review our development plans as new environmental technologies and <br />techniques evolve." . . <br />Edmonds added, "The Port Authority will continue to work to <br />address all public concerns and issues regarding the proposed <br />facility, setting a new standard in the maritime industry for <br />environmental stewardship and community friendliness. The Port <br />Authority wants.to be a good neighbor and will work as hard as we can <br />to meet that goal." <br />. u.S. Congressman Gene Green commented, "Having represented the <br />port area for many years in Austin and Washington, D.C., I know the <br />port makes continuous efforts to be a good neighbor. We have witnessed <br />it protect the environment with projects such as the widening and <br />deepening of the Houston Ship Channel. This FEIS shows that the <br />Bayport project will be planned and constructed with the same level of <br />environmental and civic commitment. I have been a long-time supporter <br />of the Port of Houston, and I readily support the Bayport'terminal." <br />U.S. Senator John Cornyn remarked, "The positive results outlined <br />in the U.S. Army Corps of Engineers' FEIS on the Port Authority's <br />proposed Bayport project are welcome news. I'm confident that the <br />Bayport project will help create jobs and stimulate the economy not <br />only in Houston, but throughout the region." <br />Built out in p~ases over 15 to 20 years to meet market demand, the <br />Bayport complex will have enough space 'for seven ships and a 378-acre <br />container storage yard. It will have a maximum capacity of about 1.4 <br />million containers -- a 200 percent increase over the Port Authority's <br />current container handling capacity. The facility is expected to <br />create approximately 39,000 jobs and contribute approximately $1.6 <br />billion to the Texas economy through wages and tax revenues. <br />In anticipation of the FEIS and a construction permit, the PHA ha~ <br />been advertising for and receiving RFQs and proposals over the past <br />several months in an effort to save time and money when construction <br />is authorized. The entire bidding and contracting process can take six <br />to eight months from the time bids are submitted, evaluated by staff, <br />reviewed by commissioners and then awarded. Following the granting of <br />a permit, the PHA estimates that as many as 16 contracts totaling more <br />. than $180 million will be awarded during the first part of the Bayport <br />project. More than half of that amount is expected to be Small <br />Business Development Program-eligible contracts, and can result in as <br />much as 35 percent participation by qualified small businesses. <br /> <br />5/19/2003 <br /> <br />Page 20f9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.