My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-29-2003 Bayport Expansion Review Committee Meeting
LaPorte
>
.Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2003
>
05-29-2003 Bayport Expansion Review Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 5:23:42 PM
Creation date
7/31/2025 10:27:08 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
5/29/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />. <br /> <br />the container wharf instead of sheet pile wharf <br />construction to eliminate noise associated with pile drive <br />equipment. <br /> <br />The Port will use drilled shafts instead of pile driven <br />supports to reduce noise. <br /> <br />Operation <br /> <br />All terminal equipment will be properly maintained to <br />reduce noise. <br /> <br />All crane spreaders will be fitted with an impact control <br />device which will reduce impact noise by approximately <br />35%. <br /> <br />5. Surface Transportation Matters (Motor Vehicles and Railroad) <br /> <br />Most of the roadways identified as requiring improvements will <br />need to be improved in the future, regardless of whether or <br />not the PHA builds the Bayport facility. These required <br />improvements are addressed in the no-action alternative. <br /> <br />The need for roadway improvements in most of the study area <br />would be triggered by the projected increases in "background <br />traffic" (trips not associated with facility). This does not <br />include the widening of Port Road from two lanes to four <br />lanes, or ramp improvements (flyovers) between State Highway <br />146 and Port Road. <br /> <br />. <br /> <br />The need for improvements along SH 146 would be accelerated as <br />a result of the Bayport project. A comparison of the required <br />improvements at full build-out in the year 2025 indicates that <br />one additional freeway larye would be needed in each direction <br />on SH 146. The comparison also indicates that the Bayport site <br />would require the least amount of lane mile construction <br />compared to the alternatives. <br /> <br />Table 3.5-53 <br />Comparative Total of Lane Miles Required Per Alternative <br /> <br />Year <br /> <br /> Alternative 2005 2015 2025 <br /> ----------- ---- <br />Bayport 2 16 82 <br />Pelican Island 1 40 99 <br />Spillmans Island 9 16 100 <br />Shoal Point/Bayport 1 21 105 <br />Upper San Jacinto Bay/Bayport. 4 22 111 <br />Shoal Point 1 15 127 <br />Cumulative Scenario 17 30 166 <br />Cedar Point 9 62 184 <br />No Action Alternative 132 186 229 <br /> <br />... <br /> <br />The PHA's main function is to provide, operate, and maintain <br />waterways and marine facilities for cargo and passenger ships. <br />The PHA does not build roads outside of its facilities <br />(responsibility of cities, county, or state). The PHA, <br /> <br />5/19/2003 <br /> <br />Page 8 of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.