Laserfiche WebLink
• <br />IP®II~~ ®1~ IAI~L~J~~~~ A~J~I~I®I~II~~Y <br />EXECUTIVE OFFICES: 111 EAST LOOP HOUSTON, TEXAS 77029-4327 <br />MAILING ADDRESS: P.O. BOX 25G2 HOUS'T'ON, TEXAS 77252-25G2 <br />TELEPHONE: (713) C,70-2400 FAX: (713) G70-2429 <br />H.T. KO RNEGAY <br />Executive Director <br />(713) 670-2480 <br />June 26, 2003 <br />The Honorable Chuck Engelken <br />Councilman <br />City of La Porte <br />604 W. Fairmont Pkwy. <br />I,a Porte, TX 77571 <br />Dear Councilman Engelken: <br />~~~uSTOry~Gy <br />T <br />~ A <br />O =i <br />o- - -~ <br />s s <br />y~~sTON,TF~P~ <br />The Port of Houston Authority believes that vigorous public discussions are essential to <br />ensure that all questions and concerns related to the potential design, construction, and <br />operation of the proposed Bayport Container and Cruise Terminal are addressed. The <br />public process is severely undermined, however, by the kind of distorted analyses and <br />misinterpretations that have been perpetuated by members of the Galveston Bay <br />Conservation and Preservation Association (GBCPA). <br />For example,' members of GBCPA have asserted that Spilman Island, an active disposal <br />site for dredge material from the deepening and widening of the Houston Ship Channel, <br />is a feasible alterative to Bayport. Their assertions were based on the results of a new <br />study released May 16 by S&ME, Inc., a South Carolina-based engineering contractor for <br />the Harris County Public Infrastructure Department. While the PHA actively supported <br />the independent analysis performed by S&ME and concurs with its technical accuracy, <br />the results must be understood and interpreted in light of the assumptions on which the <br />analysis is based. <br />The S&ME report assumed six inches of post-construction settlement, and considered a <br />range of loading conditions, some of which are lower than the actual calculated design <br />loads for the terminal paving. Using different and, in our opinion, unacceptable <br />assumptions, the resulting analysis lowered the cost of stabilizing the poor soils at <br />Spilman Island, and ignored the expensive costs to protect and repair pavement, <br />underground utilities when large settlement occurs, and the impact on equipment <br />operations. Local experts familiar with Houston construction requirements agree that the <br />true cost to stabilize soils at Spilman Island is at the high end of the range of the S&ME <br />report - or about $ 210 million more -than at Bayport, which requires no additional <br />stabilization cost. The SBiME report itself recognizes that stabilization of Spilman Island <br />would cost considerably more than the Bayport alternative and also cautions that their <br />estimate in excess of $200 million does not include "other cost issues" such as "pipeline <br />relocations, acquisitions of a new dredge disposal site, parking garage costs, etc. <br />