Laserfiche WebLink
t N <br />1107 RL[tTW000 ORIV[ ~ BAYTOWN. TfxAS 77020 -HOH[ (7fJ) A21•E219 <br />.September 16, 1974 <br />ESTIMATE NUMaER: Final <br />PROJECT: City of La Porte - Be]fast Road Water Mains - Job No. 74-1103 <br />CONTRACTOR: South Coastal Construction Co., P. 0. box 1028, 8avtown, Texas <br />AMOUNT OF CONTRACT: X24,870.00 CONSTRUCTION TIME: 30 Working Days <br /> Item <br /> No. I tem ~ uanti t Uni t Unit Price <br /> 1. 6" Class 150 Asbestos-Cement Water Line <br /> by open trench construction with special <br /> backfill Com lete in lace 1,435 ~,F. 8.40 <br /> 2. 6" Class 150 Asbestos-Cement Water Line <br /> by augered construction, Complete in <br /> lace 503 L.F. 11.00 <br /> 3. 12" x 12" x 6" Tapping Sleeve and Valve <br /> w Valve Qox Com lete in lace 2 Each 600.00 <br /> 4. 6" x 6" x 6" Tapping Sleeve and Valve <br /> w/Valve Box Com lets in lace - 0 - Each 380.00 <br /> 5. 6" Gate Valve w/Valve Box, <br /> Com lets in lace 3 Each 225.00 <br /> 6. 6" 90° Bend Com lets in lace - 0 - Each 90.00 <br /> 7. 6" x 6" Cross Com lets in lace 1 Each 150.00 <br /> 8. 6" x 6" lee Com lets in lace 1 Each 120.00 <br /> 9. 6" Plu Com lets in lace 1 Each 45.00 <br /> 10. Fire Hydrant, 4'Bury, Complete <br /> in lace 1 Each 490.00 <br /> 11. 6" 22-1 2° Bend Com lets in lace 2 Each 90.00 <br /> 12. Service Connection Com lets in lace 41 Each 90.00 <br /> i3:~ Extra Work All Sump 498.00 <br />TOTAL kORK COMPLETED ' <br />*Extra Work consisted of placing 5 new <br />copper services under street <br />by boring <br />, <br />4 @ X95.00 and 1 ~ X118.00 .. ~ . <br /> <br />__. <br />- -- <br />Total <br />12,054.00 <br />5,533.00 <br />-0- <br />675.00 I <br />-0- <br />150.00 <br />120.00 <br />45.00 <br />490.00 <br />180.b0 <br />00 <br />