Laserfiche WebLink
• r • <br />J <br /> <br />• <br />The Honorable Mayor & City Commission <br />City of La Porte <br />C <br />September 25, 1974 <br />Page 2 <br />office work required for acquisition of the right-of-way necessary to <br />construct the proposed facility. The special services also include per- <br />forming asoils and foundation investigation. We propose that this work <br />be performed by McClelland Engineers, Inc. Attached please find a <br />proposal from this firm for the investigation required on their project. <br />BASIS OF COMPENSATION <br />For our compensation for performing the basic engineering services <br />described above, we propose that we be compensated in accordance with <br />Section VI. B. of the attached Agreement. The facility described in the <br />Design Summary is a grade crossing elimination which is Classification <br />"A" work according to the 1972 General Engineering Services Manual of <br />the Consulting Engineers Council of Texas and the Texas Society of Pro- <br />fessional Engineers. For our compensation for performing the field <br />surveys for design and land surveys described above, we propose that <br />we be compensated on a reimbursable basis in accordance with Sections <br />VI. D. 1, and VI. D, 9., respectively, of the attached Agreement. We pro- <br />pose that the fee for the design phase be 85 percent of the total fee for <br />the basic services and that payment for the services be on a monthly <br />basis in accordance with Section VI. B, of the Agreement. We propose <br />that until basic design services are complete and bids received, that <br />the monthly billings be based on an estimated construction cost, including <br />15 percent contingencies, developed in the conceptual study, of $1, 250, 000 <br />as shown in the "Preliminary Cost Estimates" attached to the Design <br />Summary. <br />Design Summary <br />In consideration of the information developed during the investigation <br />made for Southern Pacific to develop the attached Design Summary, we <br />propose that $5000 of the fee paid by Southern Pacific for those services <br />be credited toward the fee for the basic engineering services proposed <br />herein in accordance with Section VI. A, of the Agreement. <br />Using the basis of compensation for the basic engineering services aes- <br />cribecl above and the current estimated construction cost including <br />" contingencies of $1, 250,'000, yields a suggested percentage fee of 7. 35 <br />percent. Using 85 percent of this for the basic design services yields <br />