Laserfiche WebLink
~, <br />• <br />contractors shall never relieve the contractors for liability therefor <br />or subject the Engineer to any liability for any such defect or <br />deficiencies. <br />7. Check and approve samples, catalog data, .schedules, shop drawings, <br />laboratory, shop and mill tests of materials and equipment and <br />other-: data which the contractor is required to submit, only for con- <br />formance with the design concept of the Project and compliance <br />with the information given by the Contract Documents; and assemble <br />written guarantees which are required by the Contract Documents. <br />8. Prepare monthly and final estimates for payments to contractors, <br />and furnish to the Owner any necessary certifications as to pay- <br />ments to contractors and suppliers. <br />9. Conduct, in company with the Owner, a final inspection of the <br />Project for conformance with the design concept of the Project <br />and compliance with the Contract Documents, and approve in <br />writing final payment to the contractors. <br />10. Revise contract drawings, with the assistance of the resident Project <br />Representative, to provide record drawings of the completed Project. <br />The Engineer will use his best efforts and will exercise the usual <br />• degree of care in preparing these drawings; he shall not be required <br />to guarantee the accuracy of the record drawings. Furnish a set of <br />prints of these record drawings to the Owner. <br />SECTION: III <br />AUTHORIZATION OF SERVICES <br />No professional services of any nature shall be undertaken by the Engineer <br />under this Agreement until he .has received written authorization from the_ <br />Owner, in which the following elements are specified: <br />1. The nature of the particular assignment. <br />2. The scope of the services to be performed. <br />3. The exact basis of payment for the services to be performed <br />(as provided in Section VI). <br />4. A citation of the action of the City Council under which the as sign- <br />ment was authorized and the appropriation was made. <br />5. Any credit provisions to which the Owner is entitled. <br />6. The time allowed the Engineer for the performance of the services. <br />-4- <br />