My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1974-10-23 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1974
>
1974-10-23 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:51 PM
Creation date
7/31/2025 10:32:08 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/23/1974
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />bona fide bid, if no contract is awarded. Where no proposals or bona fide <br />• bids are received, the Engineer's estimates prepared as a part of the De- <br />sign Phase shall be the basis for final payment for these two phases. No <br />reduction shall be made from the percentage charge on account of penalties <br />or liquidated damages or other sums withheld from contractor's payments . <br />A. Preliminary Phase <br />Payment to the Engineer for services in the Preliminary Phase <br />shall be a lump sum of $8500, payable upon submission to the Owner <br />of the required report, sketches,, and estimates, and upon his accep- <br />tance, which shall be within 30 days after submission. The Desi n <br />Summary and accompanying drawings as submitted and approved at <br />the conclusion of the conceptual study will constitute the preliminary <br />engineering report. <br />B. Design Phase <br />Payment for services in the Design Phase shall be made to the <br />Engineer in a sum equal to a percentage of the "construction cost" <br />of the work authorized by the Owner in this Phase of the Project, as <br />determined by multiplying the Basic Charge in percent (defined by <br />• Enclosure A, which is attached hereto and made a part hereof) by the <br />factor 0. 85. <br />The classification of the construction work is Classification"A" <br />for the purpose of applying the alternate Basic Charge and is that <br />given in Section 3 of the current General Engineering Services Manual <br />of the Consulting Engineers Council of Texas and the Texas Society of <br />Professional Engineers (which Section 3 is here adopted by reference <br />as part of this A.greement). <br />Partial payments for services in the Design Phase shall be made <br />monthly, based on the Engineer's estimate of the "construction cost" <br />of the work. Payments will be made in proportion to that part of the <br />services in the Design Phase which has been accomplished as evidenced <br />by monthly statements submitted by the Engineer to the Owner. Each <br />partial payment for services in the Design Phase shall be reduced by <br />20 percent as a credit against prior payments made to the Engineer for <br />services in the Preliminary Phase. The maximum total amount of such <br />credits shall be $5000. Final payment for services authorized in the <br />Design Phase shall be due upon the completion of these services. <br />C. Construction Phase <br />• Payment for services in the Construction Phase shall be made to <br />the Engineer in a sum equal to a percentage of the "construction cost" <br />of the work authorized by the Owner in this Phase of the Project, as <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.