Laserfiche WebLink
• <br />BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS <br />11O7 FLEETWO0O DRIVE - BAYTOWN, TEXAS 77520 - PHONE (713) 422-8213 <br />Is <br />November 17, 1975 <br />Honorable Mayor Pro Tem and <br />City Commissioners <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, Texas 77571 <br />PARTIAL PAY ESTIMATE FOR WATER WELL NUMBER 5 <br />We have performed a final inspection of the referenced installation <br />and all contract items have been completed with the exception. of <br />startup. This, of course, cannot be performed until the proposed <br />water line is built. We therefore recommend that this payment with <br />hold $750.00 for the startup item. The total contract as revised <br />for completing the well in the Lower Alta Loma and rather than the <br />Lissie is $294,700.00. This pay estimate then will be for <br />$293,950.00 less previous payments of $254,655.00 or $39,295.00. <br />ems P\r. 1lutchisOf�; P. . <br />r - <br />Ra, <br />ce President <br />JPH/sh <br />u <br />