My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-04-05 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-04-05 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:20:31 AM
Creation date
7/31/2025 10:32:42 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/5/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUSCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENOINEERS <br />1107 rLEETWOOO DRIVE - BAYTOWN, TEXAS 77520 PHONE (71-) 422.0213 <br />0 <br />March 19, 1976 <br />Honorable Mayor Pro Tem and <br />City Commission <br />City of La Porte <br />Post Office Box 1115 <br />La Porte, Texas 77571 <br />FINAL ESTIMATE - WATER LINE REPLACEMENT ON FARRINGTON AND COLLINGSWOOD <br />IN FAIRMONT PARK <br />The attached final estimate for the referenced job shows the total cost <br />of the originally scheduled work, one change order, and the required -extra <br />work to be $54,838.17, an overrun of $12,827.00. Of this overrun, $5,945.25 <br />represents the change order issued for extra work at the Farrington -Collings- <br />wood intersection which involved considerable pavement removal and replacement, <br />augered installation of the 12-inch line across Collingswood, and replacement <br />of the sidewalk. <br />The balance of the overrun, $7,715.34, was caused by the extra work required <br />at every street intersection. This extra work and the fittings used came <br />about because the existing system in each case was different when uncovered <br />than that represented on the available drawings. There was also a great <br />deal of congestion because of shallow storm sewers, the old 12-inch line <br />and the proximity of the street and sidewalk. <br />In two cases it was necessary to relocate fire hydrants to make room for <br />the work, and at one point, a branch line was found which was not known to <br />exist, and provisions had to be made to tie it to the new line. At Belfast <br />an additional 54 feet of line was added toward Spencer to avoid congestion <br />and at Collingswood the new line was extended to the South across the street <br />so the old.cast iron line under Collingswood (not known to exist before) was <br />taken out of service. In all, an additional 140 feet of 12-inch line was <br />added: Because of the differences in the existing system and what was <br />thought to exist, it was necessary to add some 6-inch gate valves and one <br />12-inch valve so that the change over to the new line could be effected <br />,without cutting off water service for any length of time. <br />If you have further questions concerning this project, I shall be happy to <br />discuss it in greater detail at your convenience: <br />The contractor has completed all of the specified work, and we recommend <br />final payment at this time. <br />J es P. Hutchiso <br />n, P.E. .V' a President <br />JPH/dle <br />
The URL can be used to link to this page
Your browser does not support the video tag.