Laserfiche WebLink
f <br />1 '.' <br />DATE __t� rch 22 1976 <br />6ECT_— <br />JOB NO. _ La Porte Lib. <br />NAMES <br />ENCLOSURES: <br />Change Order No. 3 <br />Please sicn and return <br />One copy toContractoli <br />and One copy to our <br />office. <br />PLEASE READ CAREFULLY <br />IF THERE ARE ANY ERRORS <br />CR CORRECTIONS, PLEASE <br />NOTIFY THE SENDER IMME- <br />DIATELY IN 4VRI T i`.iG.OTHER- <br />VOSn THE ABOVE WILL BE <br />ASSUMED TO BE CORRECT. <br />REED and <br />CLEMENTS <br />AIA <br />ARCHITECTS <br />PLANNERS <br />i <br />f � I <br />Mr. Larry Broussard i <br />Di rector of Finance <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, TX 77571 <br />f <br />Dow Mr. Broussard; i <br />,.The enclosed change order_ covers,add_iti.ona!_costs in _four <br />areas: handicap ramp, carpeting, electrical metering box, <br />and drinking fountain relocation. At this time we do not <br />have figures for installing panic hardware on three existing <br />doors. <br />i <br />I. The base cost of the ramp redesign.is $480.00. This in- <br />cludes the ramp itself and the required handrail. Additional <br />changes in the ramp requested by the city council (stripping <br />and demolition of existing walk) raises the price $780.00. <br />2. The carpet change order covers additional costs of partial <br />_ carpeting of the workroom,_ ($221.64)_ and. labor, for moving the <br />bookshelves along the wall during the week'of carpet installa- <br />tion. <br />3. The electrical'metering box was required by Houston Light- <br />ing'and Power Company. It was supplied by}H.L. & P., but <br />required additional labor to install ($104.00). <br />4. The State building Commission requested us to lower the <br />drinking fountain to meet the new requirements ($75.00). <br />The above listed change or-dar items raises the contract price <br />-- to $72,437.14. We still have a $2,000.00 contingency allowance <br />and $350.00 left from the testing allowance to deduct from the <br />final contract price. When all figures are considered, we can, <br />- -spend an additional $812.86 on' any future change orders and - <br />bring the project in at the original contract price of,$70,900.00. <br />i <br />If there are any questions regarding these; -figures, please call. <br />_ Please: return one copy of the signed_Change Order to our office. <br />i <br />Yours j ru 1 y, <br />REED AND CLEMENTS,+A.I.A. <br />9-11 J, <br />161 <br />Calvin E. Powitzky; Jr., Archi ec <br />CEP ehp ( I <br />c � <br />�A <br />'" SUITE 204 1149 ELLSWORTH PASADENA 77506 713 - 473.0420 <br />