My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-06-07 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-06-07 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:22:36 AM
Creation date
7/31/2025 10:32:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/7/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUSCH, HUTCHISON- & ASSOCIATES, INC. CONSULTING ENGINEERS <br />• 1107 FLEETWOOD DRIVE - BAYTOWN. TEXAS 77520 - PHONE (713) 422-8213 <br />June 1, 1976 <br />ESTIMATE NUMBER: Final <br />PROJECT: City of La Porte - Water Main Between Water Well #5 & 16th Street - Job 75-1234 <br />#NTRACTOR: BORING & TUNNELING COMPANY OF AMERICA, INC., P. 0. Box 14214, Houston, TX 77021 <br />AMOUNT OF CONTRACT: $46,528.00 CONSTRUCTION TIME: 20 Working Days <br />Item <br />No. <br />Item <br />Quantity- <br />Unit <br />Unit Price <br />Total <br />1. <br />16" Class 150 Asbestos -Cement <br />Water Line, Open Trench Con- <br />struction, Complete in place <br />2,900 <br />L.F. <br />12.25 <br />35,525.00 <br />2. <br />16" Class 150 Asbestos -Cement <br />Water Line, Tunnel Construc- <br />tion, Complete in place <br />60 <br />L.F. <br />70.00. <br />4,200.00 <br />3. <br />10" Class 200 Asbestos -Cement <br />Water Line, Open Trench Con- <br />struction, Complete in place <br />38 <br />L.F. <br />4.00 <br />342.00 <br />4. <br />10"•45' C. I. Bend, <br />Complete in place <br />-1 <br />Each <br />85.00 <br />85.00 <br />5. <br />1611 x 16" x 10" C . 1. Tee, <br />Complete in place <br />1 <br />Each <br />330.00 <br />330.00 <br />6. <br />1611 x 16" x 6" C . 1. Tee, <br />Complete in place <br />2 <br />Each <br />320.00 <br />640.00 <br />7. <br />16" Horizontal Gate Valve <br />w/Valve Box, Complete in <br />lace <br />2 <br />Each <br />2,500.00 <br />5,000.00 <br />8. <br />6" Gate Valve w/Valve Box, <br />Complete in place <br />2 <br />Each <br />150.00 <br />300.00 <br />9. <br />16" Plug, Complete in place <br />1 <br />Each <br />100.00 <br />100.00 <br />10. <br />Fire Hydrant, 4' Bury, with <br />"Hydrolock" Connector, <br />Complete in place <br />2 <br />Each <br />500.00 <br />1,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.