Laserfiche WebLink
., J • • <br />~SCH, HUTCHISON & ASSOCIATES, 1NC. CON3ULTIHOLNOIN[CH3 <br />1107 FLE CTW000 Df11VE - ©AYTOW N, TEXAS 77520 - PHONE (713) 122.8211 <br />September 3, 1976 <br />ESTIt~~ATE NUiidER: Two -August 1 , 1976 through August 31 , 1976 _ - <br />PROJECT: City op La Porte -Preparation of Fairmont Park Sitework -Job Number 74-1155 .--~:-.~ <br />CON7RI~CTOR: McKey Construction & Equipment Rentals, Inc., P, 0. Box 9, La Porte, TX 77511 ~~~ <br />AhTouNT OP cor~TRACT: $19,000.00 CONSTRUCTION TIME:• 20 Working Days <br />- <br />No Item uantit Unit Un1ti~Price Total <br />. ~,. <br />i Supply <br />Naul and Grade f i 1 l ~ - ~ ~ `~' - - -~ <br />. , L <br /> to confoi~rn to topographical ~ <br /> <br />configuration shown on the ~ <br />U <br />~ <br />-. <br /> Drawing, Including cuts as Lump .• <br /> re ui'red, Com lete in lace 90% Sum 17,608.00 - 15,847.20 <br />2. Install and Backfi.ll 18" ~ ~ - <br />• Diameter ASTtd C-76 Class III, <br />TE <br />G <br />RCP C <br />l <br />t <br />ho - ~ . <br /> ~ <br />, <br />u <br />ver <br />as s <br />wn on <br /> the Dratirin ,Com lete in lace 16- L.p. 12,00 192.00 - <br />,3; ins-tall and Back~i-11 24" - '~- <br /> D~c~r~eter, 16 ga. CMP Out~alls, • <br /> coated per AASHQ Mi 9Q Stith- - <br />_-- required bands and bpi ts, <br />---- Com let~~~r1 ~lac~ 80 l.F. 15.00 1,200.00 <br />. ~ 70TAL WORK COMPLETED ~ $17,239.20 <br />t: <br />~~. <br />~'i <br />. ~, <br />.~. ~ - <br /> ~~`~' -. <br />- -:_:: <br /> <br /> <br /> <br /> . ,. <br />r <br /> ~. <br />' •~. r' , c <br />~- <br />~ 1. <br />• - ~ ~ • -~ .4 ~~•• 1•'1 <br /> ~ • ~ , <br /> <br /> <br /> <br />- • 'I 1 <br />~ ~ <br />• i <br />E- <br />,: <br />+ ._ -,: <br />