My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-12-06 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-12-06 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
7/31/2025 10:33:07 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/6/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.~----~ <br />BUSCH, HUTCH ISON & ASSOC i ATE S, INC. CONEVLTINO [N61Nt[N1 <br />December 2, 1976 <br /> <br />l • <br />ESTIMATE NUMBER: Two (2) of Change Order # 1 <br />PROJECT: City of La Porte - North 16th Street Water Main - Job tJo. 76-1351_ <br />CONTRACTOR: BEN FELTS UTILITY CONTRACTING CO., P. 0. Box 1249, Pearland, Texas 77581 <br />AMOUNT OF CONTRACT: $21,972.07 CONSTRUCTION TIt•1E: 30 4torking Days <br />Item <br />No. ' <br />Item <br />uantit <br />Unit <br />Unit Price <br />Total __ <br /> <br />1. <br />11 <br />8 C1-ass 150 Asbestos-Cement 6.66 .366.96. <br /> .Open Trench Con- <br />tJater line, <br /> <br />struction Com lete in lace 1,740 L.F. 5.86 10,196.40 <br />-_ <br />2. 8" Class 150 Asbestos-Cement <br /> Water Line, Angered Con- <br /> struction Com lete in lace 142 L.F. . 19.36 2,7.49.12_ <br />3. 6" Class 150 Asbestos-Cement <br /> 4later Line, Open Trench Con- <br /> struction, Com lete in lace 50 L.F. 4.40 220._00_.___ <br />4. 8" x 8" Tapping Sleeve and <br /> Valve w/Valve Box, Complete <br /> in lace 2 Each 697.02 _.1,394.04 <br />5. 8" Gate Valve w/Valve Box, <br /> Com lete in lace 2 Each 297.60 __.__.595.20 <br />6. 8" x 6" C. I. Tee, Complete <br /> in lace 3 Each 116.30 348.90__.__. <br />7. 6" Gate Valve w/Valve Box, <br /> Com lete in lace 4 Each 231.00 ____ 924.00 __ <br />8. Fire Hydrant, 4' Bury, <br /> with "Hydrolok Connector, <br /> Com lete in lace 2 Each 581.32 _ 1 162.64_. <br />9. 6" P1 ug, <br /> Com lete in lace _2__~ Each ____ 29_.0.0___ _________58.00 __ <br />i0. 8" Plug, <br /> Com lete in lace 1 ~ Each 31.00 31.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.