My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1976-12-06 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1976
>
1976-12-06 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:52 PM
Creation date
7/31/2025 10:33:07 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/6/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />;•,-~ <br />_= -_ =_ <br />~s- <br />• J F <br />TOM BASS <br />COMMlSS10NER <br />PRECINCT 1 <br />November 24, 1976 <br />Mr. J. J. Mesa <br />Mayor, City of La Porte <br />P. 0. Box 1115 <br />La Porte, Texas 77571 <br />Dear J. J.: <br />It was certainly a pleasure to meet with you and council member Kline on the 11th. <br />I have enclosed a copy of my letter to the County Engineer, Richard P. Doss, re- <br />Questing a traffic study of Spencer at Farrington. There will be additional ma- <br />• terial applied to the surface at the intersection Spencer at Underwood early next <br />year. Hopefully the modifications to the signal which will allow for protected <br />left turn from Spencer to Underwood will be completed before long. The traffic <br />volwne on Underwood has not been sufficient to warrant the construction of left <br />turn lanes. However, the situation will be reviewed prior to the reconstruction <br />of Underwood Road. <br />You may recall during the discussion of the condition of the north lanes of Fairmont <br />that the impending 1975 Bond Project reconstruction was mentioned as a determining <br />factor in the kind of repairs Precinct 1 has made. The Bond Project will include <br />the removal and replacement of all existing sub-grade. For this reason, Precinct 1 <br />will limit the repair work as much as possible in order to avoid investing both <br />materials and labor in the more lasting repair work which requires replacement of <br />the surface and sub-grade where the detrioration has taken place. Naturally, every- <br />one looks forward to the elimination of this problem by the Bond Project reconstruc- <br />tion. <br />I have asked Mike Noblet, Precinct 1 Environmental Aide, to get in touch with you <br />in order to see if there is anything Precinct 1 can do to assist you regarding the <br />problem you described with the Flood Control ditch between San Jacinto and Texas. <br />Mike is very knowledgeable about the operations within the Flood Control District <br />and is the member of my staff who acts as liaison to the District. <br />As I mentioned at our meeting the area office of Precinct 1 which serves the La Porte <br />area is operated by Jane Cherry and located in the new Clear Lake Courthouse Annex. <br />Calls related to routine road maintenance work or requests to set culverts on county <br />• <br />FAMILY LAW CENTER • 1 1 15 CONGRESS AVENUE • HOUSTON. TEXAS 77002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.