Laserfiche WebLink
• • <br />BUSCI-l, HUTCHISON & ASSOCIATES ~1 V~. CONSULTING ENQINEERf <br />1107 FLEETW000 DRIVE BAYTOWN. TEXAS 77520 - PHONE (713) 422.921a <br />February 3, 1977 ' <br />ESTIMATE NUMBER:. FINAL <br />PRO,ECT: C1'ty of La Porte - Preparation of Fairmont Park Sitework -Job Number 74-1155 <br />CONTRACTOR: McKey Construction & Equipment Rentals, Inc., P. 0. Box 9, La Porte, TX 77571 <br />AMOUNT OP CONTRACT: $19,000.00 CONSTRUCTION TIME.: 20 Working Days <br />No. Item <br />1. Supply, Haut and Grade fill <br />to conform to topographical <br />configuration shown on the <br />Drawing, including cuts as <br />re u~'red , Com 1 ete i~n 1 ace <br />2. Install and Backfill 18" <br />Diameter ASTM C-76 Class III, <br />T&G, RCP Culvert as shown on <br />the Drawin ,Com lete in lace <br />• 3. instal l and Backf i~l 1 24" <br />Di;ar~eter, 16 ga. CMP Qutfa~s, <br />coated per AASHO M19Q ~tl~th' <br />requ~`red bands and bolts, <br />~~~ Complete it place <br />antity~Unit <br />Lump <br />100% Sum <br />L.F. <br />80 ~L.F.~ 15.00 <br />TOTAL WORK COMPLETED <br />Unit Price <br />17,608.00 <br />12.00 <br />Total <br />,Pay 100% of $19,000.00 $19,000.00 <br />Less Previous Payments 15,515.28 <br />PAY THIS AMOUNT $ 3,484.72 <br />yes P. Hutchison, P. . <br />Udl e <br />17,608. <br />192.00 <br />1,200.00 <br />19.000.00 <br />