Laserfiche WebLink
F al—rnant <br />Fart: <br />- Section <br />II <br />Sanitary <br />Sewage Main Collection <br />Line <br />Cost Estimate <br />• <br />1. SANITARY SEWER: <br />570 <br />L.F. <br />18" V. C. <br />Sewer <br />pipe 10/12 ^ $19.20 L.F. <br />$10,944.00 <br />711 <br />L.F. <br />18" 'J. C. <br />Sewer <br />=ipe 12/14 = $21.80 L.F. <br />15,4G9.80 <br />270 <br />L.F. <br />18" 'f. C. <br />Sewer <br />Pipe 14/16 A $25.00 L.F. <br />7,C20.00 <br />2 <br />Each <br />Manholes <br />10/12' <br />p $600.00 each <br />1,200.00 <br />2 <br />==_n <br />0onnec. to <br />=.:isting Line :10C.00 <br />Total Esti,i ated Construction :. zt <br />:;6, 063.80 <br />Contingencies : 5% <br />;3g�c1191 <br />=^ginee_i-_ =10%:� <br />n <br />:CCTAL COST: <br />• 2. EXTRA WORK ITEMS - IF REW.i1.ED: <br />1551 L.F. Well Points S $10.00 L.F. $15,510.00 <br />1551 L.F. Wet Sand Construction <br />$12.00 L.F. 18,612.00 <br />Total Esttnated Construction Cost w34,122.00 <br />Contingencies @ 5% 1,706.10 <br />$.).7 .10 <br />Engineering C 109 3,582.81 <br />TOTAL ESTIMATED COST: $39,410.91 <br />0 <br />