Laserfiche WebLink
• <br />• <br />SHARING CONSTRUCTION COST OF 18" TRUNK LINE <br />Total Construction Cost 18" Trunk Line $ 37,261;00 <br />Extra Work Items <br />Relocate Power Pole 680.00 <br />Core Borings 126.00 <br />Engineering @ 10% <br />Total Cost <br />COST SHARING BREAKING DOWN <br />Glen Meadows S/D @ 27.5% <br />Fairmont Park North @ 23.8% <br />Fairmont Park West, Section I @ 15.31% <br />School Site @ 4.2% <br />Fairmont Park West, Section II @ 20.8% <br />Fairmont Park West, Reserve @ 8.4% <br />ENGINEERING <br />Glen Meadows S/D @ 27.5% <br />City of La Porte @ 19.5% <br />Fairmont Park, Joint Venture @ 53% <br />TOTAL COST <br />Glen Meadows S/D <br />City of La Porte <br />Fairmont Park, Joint Venture <br />$ 10,468.43 <br />9,059.95 <br />5,824.25 <br />1,598.81 <br />7,917.94 <br />$ 1,046.84 <br />742.31 <br />2-, 017.55 <br />$ 3, 806.70 <br />$ 10,468.43 <br />7,423.06 <br />4i -�U,vv(.vv <br />