Laserfiche WebLink
• OWNER ^ <br />CHANGE ARCHITECT ^ <br />-.J <br />ORDER CONTRACTOR ^ <br />FIELD ^ <br />AIA DOCUMENT G701 OTHER <br /> <br />PROJECT: A City Hall Building for the <br />(name, address) City of LaPorte <br />Harris County, Texas <br />TO (Contractor) <br />~ P.G. Bell Company. ~ <br />4511 Dacoma <br />Houston, Texas 77501 <br />CHANGE ORDER NUMBER: 1 <br />ARCHITECT'S PROJECT NO: 276-77 <br />CONTRACT FOR: A City Hall Building <br />for the City of LaPorte <br />CONTRACT DATE <br />September 26, 1977 <br />You are directed to make the following changes in this Contract: <br />Item #1. Specified Allowances not used <br />Testing <br />Hardware <br />Graphics <br />Item #2 Delete tackboards from the contract <br />Item #3 Delete west entrance drive <br />Item #4 Install water and drain in atrium <br />Ttem #5 Install electrical work in telephone <br />equipment room as per S.W. Bell require. <br />Item #6 Partition changes in rooms 125 & 126 <br />Item #7 Reduce contract price for plaster work <br />. Item #8 Install seal coat on parking lot <br />Item #9 Extension of Contract date due to rain, <br />strikes, etc. - 35 days <br />ADD DEDUCT <br />X1,041.00 <br />3,344.00 <br />736.00 <br />296.00 <br />564.00 <br />$206.00 <br />938.00 <br />no change <br />600.00 <br />no change <br />~ , 44.00 <br />~ ,58 .00 <br />The original Contract Sum was <br />Net change by previous Change Orders <br />The Contract Sum prior to this Change Order was . <br />The Contract Sum will be •Ei~~eaeed) (decreased) ~) by this Change Order . <br />The new Contract Sum including this Change Order will be <br />The Contract Time will be (increased) (d~g~) (~~gid) by <br />The Date of Completion as of the date of this Change Order therefore is <br />Doughtie & Porterfield P.G. Bell Company <br />ARCHITECT CONTRACTOR <br />~1-1-- first--~asadena.~i<.Bk. .P._O.~ox_265~ <br />-- <br />s ~ Address <br />Pasad na, Te 7750 Houston, Text 7 1 <br />• gY_ ~_ __ 13Y ~,;~ _ ~ _ <br />D~Lq~7d <br />DA{E ~C,. <br />• •$ 663,000.00 • <br />. $ <br />• • $ 663, 000.00 <br />• • ~ 5,437.00 <br />. S 657,563.00 <br />( 35) Days. <br />June 7, 1978 . <br />City of LaPorte <br />ow~.(~ER BOx~~ <br />Address <br />LaPorte, Texas ?7571 <br />BY <br />DATE <br />AIA F)OCUMr.NT 6701 CFIANGI: OROC.K AI'KIL 1970 FnITION AIA~7 O 1970 THE <br />AMCRICAN INSTITUTC OF AKCtII'ILCtS, 1735 NEW YORK AVE., NW, WAtiHING"FON, U.C. 20006 <br />ONE PAGE <br />