My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1979-03-21 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1979
>
1979-03-21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:54 PM
Creation date
7/31/2025 10:34:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/21/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br /> <br />Reference hereby being made to all of~the above mentioned in- <br />struments, which instruments are hereby incorporated by reference. City's <br />utility mains do not presently extend to said property. Owner has re- <br />quested City to extend utility mains to Owner's said property. <br />(3) City hereby agrees to construct and install an extension <br />of its utility main(s) to said property commencing at the nearest- existing <br />utility main(s) of sufficient size and capacity. Thence along/tllru City <br />of La Porte rights-of-way alld/or easements ,to said Owner's property. Pro- <br />vided, however, that should City not possess all necessary rights-of-way <br />and/or easements to complete said extension(s), Owner shall be solely <br />responsible for obtaining said additional rights-of-way and/or easements <br />at no cost to City. <br />• (4) Owner agrees to pay all costs related to the construction <br />and installation of said line(s) including necessary appurtenances in con- <br />formance with City's standards and specifications for said line(s). Owner <br />further agrees to pay all engineering fees for survey, design, contract <br />documents, bidding, construction staking, and construction inspection. <br />(5) Subject to the provisions of this agreement, City hereby <br />agrees to construct and install said extension of its utility main(s) accord- <br />ing to the plans and specifications to be prepared by the City's engineer. <br />Prior to City authorizing the City's engineer. to prepare plans and speci- <br />f cations O~oner wi_11 deposit with City in escrow a sum of money based on and <br />equal to the City engineer's estimated project cost in conformance with <br />Section 4, less estimated construction, construction staking and inspection <br />costs. Thereafter, City will authorize the City engineer to prepare plans <br />and specifications for said extension(s). Upon completion of plans and <br />specifications City will place the project for bid. Tallen bids are received <br />they shall be tabulated by the City and a copy of said tabulation shall be <br />provided to Owner. Thereafter, Owner shall deposit with City in escrow a <br />sum equal to the amount bid by the lowest responsible chosen bidder, plus a <br />sum equal to the estimated construction staking and inspection fees if <br />_ applicable. ldhen said deposit leas been made by Owner, City shall execute <br />a contract for said extension(s). It is agreed and understood that the <br />deposited escrow amount made by Owner does not relieve Owner from paying <br />for any unforseen costs and/or cost overruns in the project that result <br />from circumstances beyond the control of- City. <br />(6) City agrees to accept the value of the extension(s) that abaft <br />said Owner's property as a pro. rata portion of the prevailing square footage <br />and/or front footage connection charge for water and/or sewer service against <br />said property belonging to Owner. Owner shall be responsible for all other <br />customary charges. <br />(7) Upon execution of this agreement and <br />herein, City agrees to begin the preparation of eng <br />struction specifications for said extension(s), and <br />• thereof as soon as the same may be let for contract <br />shall require the contractor under such contract to <br />construction of the project to completion. <br />compli.allce with terms <br />ineerillg plans and con- <br />t0 begin COI1StrUCtiOl1 <br />as herein provided. City <br />diligently pursue the <br />(8) In the event- that other owners of property abut-ti.ng the <br />line(s) extended by Owner. under this contract, as shown on the plat attached <br />hereto as Iixhibat A Ind incorporated by ref:cr.ence herein, shall utilize the <br />extended la.ne(s) con:;tructed under this agreement, by making; connection <br />thereto under a perm:t.t Lr.om City withl.n a per:i_od of: ten (10) years from and <br />after. the date City llas accepted the construct:f.on of said facilities by the <br />
The URL can be used to link to this page
Your browser does not support the video tag.