My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1979-12-05 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1970's
>
1979
>
1979-12-05 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:20:25 AM
Creation date
7/31/2025 10:35:11 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/5/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />OS;O' AFICE� PIPELINE COMPANY <br />AM H HUFFMAN <br />MANAGER RIGHT OF WAY CLAIMS & PUBLIC AFFAIRS <br />Mrs. M. Goyen <br />City Secretary <br />City of LaPorte <br />P. 0. Box 1115 <br />LaPorte, Texas 77571 <br />Dear Mrs. Goyen: <br />September 19, 1979 <br />Proposed Pipeline Crossing <br />North I'D" Street <br />City of LaPorte <br />Harris County, Texas <br />Exxon Pipeline Company proposes to construct two (2) .6-inch pipelines - one <br />butane, one crude butadiene and one 4-inch benzene pipeline that will be <br />•crossing the City of LaPorte. Attached is Exxon Pipeline Company's drawing <br />No. A-15091 showing our proposed crossing of North I'D" Street, approximately <br />1.7 miles west of State Highway No. 146. <br />The pipelines are to be installed with casing and will have a minimum of <br />four feet (4') of cover. The general design criteria being"as follows: <br />4" Benzene 6" Butane 6" Crude Butadiene <br />Type of Pipe <br />Steel <br />Steel <br />Steel <br />Grade <br />X-42 <br />X-52 <br />X-52 <br />Wall Thickness <br />0.219" <br />0.219" <br />0.219" <br />Maximum Operating Pressure <br />1440 psi <br />1440 psi <br />1440 psi <br />Diameter <br />4.50" O.D. <br />6.625" O.D. <br />6.625" O.D. <br />Test Pressure <br />2160 psi <br />2160 psi <br />2160 psi <br />Attached also is Exxon Pipeline Company's draft Number 15323 in the amount of <br />$900.00 as required. A permit for the proposed pipeline crossings is requested. <br />Sincerely, <br />ot�t <br />J. A. Huerta <br />• JAH:vb <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.