Laserfiche WebLink
PRELIMINARY CONSTRUCTION COST ESTIMATE <br />Expansion of La Porte Main Sewage Treatment Plant <br />Revised December 5, 1979 <br />Sitework <br />250,000 <br />Yard Piping <br />240,000 <br />Raw Sewage Pumping Station <br />220,000 <br />Headworks <br />200,000 <br />Flow Splitter Box <br />55,000 <br />Aeration Basins <br />720,000 <br />Clarifiers <br />360,000 <br />Thickener <br />85,000 <br />Chlorination Basin <br />100,000 <br />Chlorination Building <br />60,000 <br />Sludge Dewatering Building <br />235,000 <br />Office and Laboratory <br />75,000 <br />Shop <br />50,000 <br />Electrical and Instrumentation <br />300,000 <br />Sludge Hauling Vehicle <br />50,000 <br />Subtotal <br />3,000,000 <br />Contingency @ 10% <br />300,000 <br />Present Day Total <br />3,300,000 <br />EsCAlation (1 Year = 9.4%) <br />310,000 <br />TOTAL CONSTRUCTION COST <br />3,610,000 <br />