Laserfiche WebLink
• + _~ .. <br />• a <br />+ • , <br />" ~. •~ CITY OF LA PORTE <br />INTER-OFFICE MEMOaAi~DUM <br />T0: J. R. xud ens ~ OATE : 11-24-80 <br />FROM: D. A. sen <br />SUBJECT: Water and Sewer Extension Procedures <br />TO ALL CONCERNED: Please initial and"date each box'as each item is completed. <br />1. Builder or contractor makes a request for buildin ermi <br />g p is to the <br />Inspection Department <br />N... <br />G~ 2. Inspection~theri puts the required informati -' <br />on on the Utility <br />verification form (UVF) <br />3. 1'he UVF is sent to Public Works for co <br />nfirmation of utility <br />availability. UVF should be returned to the Inspection Dept. <br />within five (5) working days. <br />4. The UVF is returned to Inspection. <br />• <br />5. If the utilities are available; Inspection collects the fro <br />nt foot <br />fee, tap fees, and Inspection fees: <br />' ~~ A. Money is sent to accounting <br />B. Inspection assigns a work order to the job. <br />C. • The required copies of the work order is sent~to Public Works. . <br />D.. The completed work is returned to Inspection. <br />5. If Utilities are not available to said <br />property; Inspection will <br />contact the builder/contractor. This will verify that he desires <br />to continue with the request. If the builder/contractor desires ~. <br />to continue the request, he must give the Inspection Dept.. an <br />Engineering Deposit at this time. This deposit is applied to <br />• the Engineering fees on the agreement and is non-refundable if <br />the builder/contractor decides not to continue after the estimate <br />• is made. Inspection will put the required information on the <br />~--~ Utility Extension Form (UEF). <br />A. Engineering will review the job and input any required design <br />changes or other requirements. Engineering will return to <br />Inspection. <br />g..: The U~ is sent to Public-Works for completion including <br />estimated charges of said extension. This should be com- <br />pleted within five :;?'r days. The UE£ is ti r-.i z-ei~urned to <br />Inspection. <br />C. Inspection will review the estimate and contact the builder/ <br />contractor to inform huh, of the .estimate and verify continuing the request. <br />D. Inspection will then collect the estimated fee and complete <br />the legal extension agreement for later presentation to Council. <br />E. A copy of all pertinent paperwork is iven to t <br />$ he City Secretary <br />for placement on a council agenda, for both a workshop and a <br />regular meeting. . <br /> <br /> <br />