Laserfiche WebLink
~ ~ ' <br />• <br />MEMORANDUM <br />June 3, 1981 <br />T0: J. R. Hudgens - <br />FROM: John Joerns <br />SUBJECT: Utility Extension, Templo Bautista Church <br />The Engineering Department earlier reviewed preliminary <br />plans for utility extensions to serve the Templo Bautista <br />Church. The proposed 2" water main was changed to a 6-inch <br />water main to provide fire protection to the facility. The <br />Church's consultant then revised the plans to include a 6- <br />inch water line for a certain distance to provide the re- <br />quired fire protection then reducing the size to a 2-inch <br />to serve the building. <br />This revised sizing, although it meets the letter of <br />the law, is not in the best interest of the City as far as <br />future extensions to serve adjacent property. Therefore, it <br />• is my recommendation that the City fund the additional material <br />costs to extend a 6-inch main to the building site. This <br />extra material cost would be approximately 100 LF (3.25 - .75) <br />_ $250.00. The total extra cost for G-inch materials and in- <br />stallation would be approximately 100 LF (6.75 - 2.50) _ <br />$425.00. <br />JJ/cb <br /> <br />John Joerns <br />Engineering rtment <br /> <br />