Laserfiche WebLink
CITY OF LA PORTE <br />INTER-OFFICE ~fE:`iot't~.~'DL^.~i <br />~o: ck~,Owen, City Manager DATE: May 28, 1982 <br />. l \~ <br />FRO`i: J -Joerns, Engineering Dept. <br />SUBJECT: Pa~ i pation in the Oversizing of an 8" to a 12" Line <br />LJes inghouse Electric Corp. <br />Westinghouse is developing a tract on Fairmont Parkway near the <br />intersection of Bay Area Blvd. Although the tract is in the Bayport <br />Industrial District, Westinghouse is prepared to extend approximately <br />2800 feet of 8" water main to-serve their needs. It is recommended <br />that the Council participate in the oversizing of an 8" to a 12" line. <br />This action would be in keeping with the plans to eventually complete <br />a 12" outer loop along Fairmont Parkway. Council has previously <br />participated in two similar oversizing requests along Fairmont Park~~aay <br />that will eventually become part of this outer loop. The approximate <br />cost of the oversizing is $15,000.00 which includes materials, installa- <br />tion, and the additional engineering fee. Westinghouse is aware that <br />. they are outside the City limits of La Porte and will have to pay 1 z <br />times the normal utility rate. <br />I recommend that the funds be taken from the Water & Sewer Contingency <br />Fund which has a balance of $169,000.00. <br />JJ/dsw <br />• <br />~, <br />~~~ <br />