My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1982-08-18 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1982
>
1982-08-18 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:56 PM
Creation date
7/31/2025 10:36:56 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />• b. Recommend a disposal system to best serve the study area for the next <br />20 years. <br />Task IX - Report Preparation <br />a. Prepare a report of the findings and recommendations for review. <br />b. Incorporate comments from reviewing agencies into a final report and <br />prepare 50 copies of this Final Report. <br />c. Make a final presentation to the governing bodies of the participating <br />entities outlining the findings and recommendations. <br />Phase II ~- <br />Phase II could include a wide variety of activities dependant upon the outcome of <br />the Phase I work plan. These activities could include regulatory permit <br />preparation, facility designs, construction administration, operator training, <br />etc. It is impossible at this time to develop a detailed work plan of these <br />activities due to the many alternatives to be considered in Phase I. <br />B. PROJECT COST ESTIMATE _ <br />MANHOUR ESTIMATE - PHASE I ONLY <br />THREE CITIES TWO CITIES LAPORTE ONLY <br />Proj. Mgr. Proj.Mgr. <br />sk Sr. Engr. Engr. Draft Steno Sr. Engr. Engr. Draft Steno Sr~JEngr. Engr. Draft Steno <br />I 52 128 0 8 36 96 0 8 20 <br />II 16 116 24 8 16 76 20 8 48 O 8 <br />III 4 48 O 8 4 16 56 16 g <br />IV 12 48 O 44 0 8 4 40 0 8 <br />V 56 80 O 8 12 48 0 8 12 48 0 8 <br />VI 36 96 24 8 36 96 24 8 56 80 0 8 <br />VII 8 12 0 4 8 12 O 4 36 96 24 g <br />VIII 16 88 0 0 12 68 O O 8 12 0 4 <br />IX 40 124 76 60 32 116 76 60 8 48 0 0 <br />24 108 76 60 <br />Total 240 740 124 112 212 636 120 112 184 536 116 112 <br />SALARY COST RANGE BY CATEGORY <br />PROJECT MANAGER/SENIOR ENGINEER $24-$27/Hour <br />ENGINEER $18-$22/Hour <br />DRAFTER $11-$13/Hour <br />STENO/CLERICAL $11-$13/Hour <br />Expenses including printing, travel and miscellaneous costs are estimated to vary <br />between $5,900 - $10,000 dependant upon number of participants. The cost will <br />vary due to a difference in the number of trips, expenses while on job site, and <br />the printing cost of varying numbers of the final report dependant upon the <br />number of participants. <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.