Laserfiche WebLink
• <br />BUJ~1 1. HUTCHISON & ASSOCIATES IIV~. CONSULTINGENGINEER6 <br />1107 FLEETWOOD DRIVE BAYTOWN,TEXAS 77520 PHONE (713) 422.821a <br />3333 EASTSIDE, SUITE 265 HOUSTON, TEXAS 7709E • (713) 523-2367 <br />August 18, 1982 <br />Honorable 2layor and City Council <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, TX 77571 <br />STATUS REPORT ON THE NEW LA PORTE SEWAGE TREATMENT PLANT <br />In mid-June 1982, when the referenced project was nearing completion, the <br />City Electrical Inspector discovered and called to our attention several <br />violations of the National & City Electrical Codes as well as the Contract <br />Specifications. A number of the problems were major ones which had to be <br />corrected before plant start-up could be accomplished. There were also many <br />items which did not effect start-up and could be corrected after the plant was <br />in operation. Several meetings were held with the General Contractor and his <br />electrical subcontractor where work schedules and punch lists were prepared. i <br />The primary aim of the schedule was to get the violations prohibiting start-up <br />cleared so the various tanks could be filled and the equipment run. This <br />was accomplished early in August and we began checking out the equipment <br />operation. <br />.This led to the discovery of some mechanical problems and leaks in some of <br />the tanks. Again work schedules and punch lists were prepar ed to correct <br />these deficiencies in a timely fashion. Work on most of these items was <br />completed Friday, August 13, 1982, and the filling of all the plant tanks was <br />started again.*Sonday, August 16, 1982, was devoted to running all the equipment <br />for several hours and checking the tanks and various transfer lines for leaks. <br />Two such leaks and one bad motor bearing were found and repair of these items <br />are being finished today. The rest of this week will be spent putting more <br />running time on the machinery as well as checking for any more serious leaks. <br />During this time the painting and electrical subcontractors are continuing <br />with their cleanup work as is the general contractor on the grounds and <br />operations building. <br />The original start-up date for the sewage treatment plant based on a calendar <br />day contract time of 548 days would have been July 15, 1982. Barring further <br />major problems it is planned to d ivert raw sewage into the plant on Tuesday, <br />August 24, 1982. This influent will be from the main plant initially while <br />the Fairmont Park plant will be kept in operation until the new plant is <br />running satisfactorily. It is expected a two week shakedown period will be <br />needed before the Fairmont Park plant would be shut down. <br />.. <br />es P Hutchison, P. E. <br />jm <br />