LJ <br />• PUNCH LIST <br />LA PORTE SEWAGE TREATMENT PLANT <br />November 15, 1982 <br />1. Double doors into MCC room of Operations Building do not fit properly and <br />leak water from rain to inside. <br />2. Two lockers for women's rest room. <br />3. Touch up spots on men's shower. <br />4. Install lift station ventilation fan. <br />5. Chlorine gas pressure gage in W-T chlorinator console does not work. <br />6. ~~1 Blower has problem. Belts squeal when turned on especially when <br />another blower is running. <br />7. Finish site work beside clarifiers and have fence replaced. <br />8. General site work and shaping of drainage ditches. Need 8" diameter or <br />12" diameter drains under two side walks to facilitate drainage. Need <br />drainage work around chlorination basin, at back door of operations <br />building, and between shop and belt press buildings. <br />9. Sidewalks at chlorination basin and at ~2 clarifier need to be raised. <br />10.' Adjust wheel on sluice gate between influent chamber and south chamber. <br />It rubs on frame. <br />11. Stencil identification on lines as required by specifications. Also attach <br />metal identification tag per specifications. <br />12. Complete grouting work in large electrical pull boxes. <br />13. Repair M.H, adjacent to chlorination building. <br />14. Handicapped rails in toilet stalls as required. <br />15. Install proper grease fittings on sludge pump hydraulic system drive motors. <br />16. Leak in underground process water system beneath sidewalk next to headworks. <br />17. Hydrogritter cyclone not working properly. It doesn't separate enough <br />water and floods hydrogritter. <br />• 18. Need backflow valve installed in pad drain adjacent to hydrogritter. <br />