Laserfiche WebLink
. - • <br />~ • • <br />Page 3 <br />Curing: <br />A. Inspection: After the curing period, the contractor shall inspect all <br />surfaces for deficiencies. All sharp splinters or hairs at curbs, ramps, <br />steps, gutters, fixtures and other mechanical devices within the pool <br />shall be removed and all surfaces shall be hand sanded until all <br />surfaces are smooth and uniform throughout the entire swimming pool. <br />B. Markings: After sanding and touch up, apply final racing lane and <br />wall targets using approved colors and methods of application. <br />C. Re-install: Reset all hardware, apparatus or mechanical devices removed <br />during the fiberglass application. If ladders and rails have been sent <br />out for re-chroming, it is the, duty of that contractor to have all <br />re-chromed parts ready and waiting for installation. <br />Warranty: <br />Before final pay out, the 5 Year Warranty-from date of completion- will be <br />given designated individual connected with pool. <br />Upon completion of work contractor shall remove all scaffolds, appliances, <br />and other equipment, and all debris from premises. <br />• <br />.. <br />t <br />~y <br /> <br />