My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1982-12-01 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1982
>
1982-12-01 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:56 PM
Creation date
7/31/2025 10:37:08 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/1/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br /> <br />• <br />• <br />CITY OF LA PORTE <br />INTER-OFFICE :fEPIORA~'DU`i <br />To: Jack Owen - City Manager DATE: November 8, 1982 <br />FROM: John Joerns - Engineering Dept. <br />SUBJECT: Water Main Extension to TCDC <br />The easements necessary for the construction of the water main to <br />serve TCDC should be received within a week. Once they-are in, the Engineer <br />for TCDC, Carlos Smith, will be ready to advertise for bids. <br />As you may recall the question of oversizing the water main from an <br />8-inch to a 12-inch has been discussed several times but has not yet been <br />approved by Council. Please schedule this item for Council action as soon <br />as possible so that we may proceed with the bid process. <br />The cost of oversizing was estimated at $68,450.00 in August 1982. <br />Due to the addition of several valves the cost may now approach $70,000.00±. <br />Although Southern Pacific Railroad refused to participate in the total <br />cost of the oversizing it would be to the City's advantage to contact them <br />again and request at least a partial participation based on their frontage <br />or acreage. It is recommended that the City of La Porte fund the oversizing, <br />whether or not any other contributions are received up front, since the 12-inch <br />main is needed to serve the undeveloped acreage in Northwest La Porte. <br />~~ <br />Joh~~i~ Joerns <br />JJ/st <br />~r ~' .L <br />
The URL can be used to link to this page
Your browser does not support the video tag.