My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-04-1983 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
05-04-1983 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
7/31/2025 10:37:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/4/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />• CITY OF LA PORTE <br /> ' INTER-OFFICE MEMORANDUM ' <br />~ r <br /> T0: Jerry Hodge, Dix-~ctor~Qf=Public Works .; DATE: April. 20, 1983 <br /> FROM:- Luther Maxey, Water/Wastewater Superintendent <br /> SUBJECT: Water Well #5{,25th Street) <br /> >' <br />On January 26 , 1983, Layne Texas Company was:: requested by us to remove. <br /> and repair the 200 HP electric motor on tirell #5• The work was.dompleted~,on <br /> ~'ebrua" _~, :.1.93,." with a charge of 'T'HREE THOUSAND EIGHT. HUNDRED 'TWENTY <br /> TWO DOLLARS AND NINETY CENTS ($3,822.90) from Layne Texas Cc~mpanr. <br /> ExCessive_~condensation had collected in.the-windings of the motor and <br /> when the well was called to come on the motor direct shorted oz~ two <br /> fields, causing the motor to essentially t1blow up". <br /> After the motor had been repaired and put back in service, our monitoring <br /> of .the well showed other irregularities.` Layne Texas Company technicians ; <br /> were called back out to determine what the problems were. It was <br /> determined that dpwhhole bearings were worn out. An estimate of approxima~Eely <br /> TWELVE THOUSAND DOLLARS ($12y(}00.00) was given,,{:.and thought to be a,high <br />• estimate) for repairs necessary downYiole. <br /> After exfraction:-,of the downhole components .of the well, other problems <br /> were found. Three of the drive shafts were badly bowed and had to be . <br /> replaced.. Two joints of the 8" x 20' column. casing pipe were pitted <br /> .from corroaon.and needed to be replaced. To correct all problems brought <br /> the total cost of-this service to THIRTEEN THOUSAND SIXTY FIVE DOLLARS <br /> AND SIXTY SIX CENTS ($23,065.66). <br /> The total cost of repairs and amount of funds necessary~f~'~n the contingency <br /> fund is as follows: <br /> Repairs to Electric motor $ 3,822.90 <br /> Downhole repairs 13 065.66.:. <br />-~~ . 5~ <br /> <br /> Council has approved TWELVE THOUSAND DOLLARS ($12,000,00) for repairs <br /> to Well #5• An additional FOUR THOUSANn EIGHT IIUND~ED EIGHTY EIGHT- <br /> DOLLARS AND-FIFTY SIB CENTS {$~+,$88.56)°will_be necessary to cover the <br /> added ~o.~t~ <br /> Please call if I can be of further assistance. <br /> LM/me <br />•_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.