Laserfiche WebLink
~ ~~ -___ <br />i,:~m Page 2 <br />f <br />• <br />C~ <br /> <br />• <br />I feel that the advantages offered by the Oneac transformer greatly outweigh <br />the additional $4,500.00 in cost over the Iow bid Topaz unit and second low <br />bid Sola unit. Downtime costs attributed to .transformer failure could greatly <br />exceed that figure should the transformer have to be returned to the factory <br />for servicing. On the strength of the five-year warranty, greater efficiency, <br />and superior heat loss performance I hereby recommend accepting the bid sub- <br />mitted by Tex-All Electrical Contractors for the Oaeac #CS 31240 in the amount <br />of $14,500.00. Should you have any questions regarding this recommendation <br />please advise. <br /> <br />