My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-01-05 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-01-05 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
7/31/2025 10:37:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/5/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • <br />• <br />Task 4.4 - Costs <br />An estimate of probable construction costs for required <br />utility improvements will be prepared for each milestone year <br />over the planning period. These estimates will be based on <br />construction costs in the Gulf Coast area modified to reflect <br />known differences peculiar to the La Porte area. <br />Task 4.5 - Preliminary Water Rate Schedule <br />Based on the cost alternatives analyzed in Task 3.2, the <br /> <br />final construction cost estimates prepared in Task 4.4, and the <br />preliminary financing plan prepared as Task 1.4, estimates of <br />the proposal system revenue requirements will be prepared. <br />These revenue requirements will be allocated to appropriate <br />functional classifications which represent the costs of provid- <br />ing the various elements of water production, delivery, customer <br />service, and administration. Various potential customer groups <br />to be served by the system will then be identified from Task 1.3 <br />and Task 2 along with their respective use characteristics. <br />Functionally identified cost of service data will then be used <br />to establish schedules of rates and charges for each customer <br />class. An analysis will then be conducted of the current produc- <br />tion costs of water for the City of La Porte. <br />Task 4.6 - Preparation for Bond Sale <br />Based on the preliminary financing plan established as <br />Task 1.4, the Engineer will work with the Authority's fiscal <br />• <br />advisors developing preliminary preparation for the issuance <br />of Authority revenue bonds. These preparations will include: <br />Task 4.6.1 - Preparation of a capital improvement project <br />schedule. <br />Task 4.6.2 - Preliminary project revenue projections. <br />Task 4.6.3 - Solicitation of appropriate letters of interest <br />or commitment from prospective customers. <br />Task 4.6.4 - Other appropriate documentation from the final <br />report. <br />• <br />a <br />~ i6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.