Laserfiche WebLink
• • <br />• <br />Task 4.4 - Costs <br />An estimate of probable construction costs for required <br />utility improvements will be prepared for each milestone year <br />over the planning period. These estimates will be based on <br />construction costs in the Gulf Coast area modified to reflect <br />known differences peculiar to the La Porte area. <br />Task 4.5 - Preliminary Water Rate Schedule <br />Based on the cost alternatives analyzed in Task 3.2, the <br /> <br />final construction cost estimates prepared in Task 4.4, and the <br />preliminary financing plan prepared as Task 1.4, estimates of <br />the proposal system revenue requirements will be prepared. <br />These revenue requirements will be allocated to appropriate <br />functional classifications which represent the costs of provid- <br />ing the various elements of water production, delivery, customer <br />service, and administration. Various potential customer groups <br />to be served by the system will then be identified from Task 1.3 <br />and Task 2 along with their respective use characteristics. <br />Functionally identified cost of service data will then be used <br />to establish schedules of rates and charges for each customer <br />class. An analysis will then be conducted of the current produc- <br />tion costs of water for the City of La Porte. <br />Task 4.6 - Preparation for Bond Sale <br />Based on the preliminary financing plan established as <br />Task 1.4, the Engineer will work with the Authority's fiscal <br />• <br />advisors developing preliminary preparation for the issuance <br />of Authority revenue bonds. These preparations will include: <br />Task 4.6.1 - Preparation of a capital improvement project <br />schedule. <br />Task 4.6.2 - Preliminary project revenue projections. <br />Task 4.6.3 - Solicitation of appropriate letters of interest <br />or commitment from prospective customers. <br />Task 4.6.4 - Other appropriate documentation from the final <br />report. <br />• <br />a <br />~ i6 <br />