My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-01-19 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-01-19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
7/31/2025 10:37:25 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/19/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ _ _ _ _ _ _. <br />•. _ • <br />" '~ ~ LLETT & ASSOCiA S, INC. <br />7703 SOUTH LOOP EAST <br />. P. O. 80X 18167 <br />HOUSTON, TEXAS 77223 <br />PH. 644.3219 <br />November 22, 1982 <br />City of LaPorte <br />P. 0. Box 1115 <br />LaPorte, TX 77571 <br />Attn: Ms. Betty T. Waters <br />City Secretary <br />Dear Ms. Waters: <br />Gullett & Associates, Inc., represents Enterprise Products Company in <br />obtaining right-of-way's and permits for two (2) six (6) inch pipelines from <br />an existing meter site to a second meter site on DuPont property to the North. <br />These two meter sites are the "heart" of the entire project. The petroleum <br />products carried by these lines will be directed, metered and controlled <br />from these stations. <br />The course of the two six inch lines will lie off existing Arco lines, <br />. as shown in the detail, and exit Northerly 0.8 miles from Sens Road into the <br />DuPont property all in the Enoch Brinson Survey, Abstract 5 as shown. <br />Since Old LaPorte Road (abandoned) is involved, we are appealing to <br />both the County of Harris and the City of LaPorte for this very necessary <br />permit. Any fees will come from this office as well as further information <br />or answers to questions you may have. The pipelines will be constructed under <br />any and all ordinances or restrictions as may be required by City of LaPorte <br />or Harris County. <br />Thank you for your timely action on behalf of Enterprise Products Company. <br />It is most appreciated. We expect to begin construction within the next <br />fifteen to twenty days and time is of the essence. <br />Sincerely, <br />Joh E. Olson <br />`fanager, Ri1;ht-of-Way Services <br />JEO:bmc <br />enclosures <br /> <br />~/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.