My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-01-19 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-01-19 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
7/31/2025 10:37:25 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/19/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C <br />J:. ~ <br />• <br />CITY OF LA PORTE <br />MEMORANDUM <br />DATE OF MEETING: January 19, 1983 <br />• <br />AGENDA ITEM: Awarding Construction Contract for Installation of Water Main to TCDC <br />ORIGINATED BY: Engineering Department - John Joerns <br />PROJECT SUMMARY: Award of Construction Contract for Installation of 12" A. C. <br />Water Main from North "L" Street to TCDC Site <br />FISCAL SUMMARY: As per an executed utility extension agreement, TCDC will be <br />responsible for the costs associated with the installation of <br />an 8-inch water main (estimated cost $184,773.20). The City of <br />La Porte has previously agreed to participate in the oversizing <br />of the main to a 12-inch and $70,000 has been approved for over- <br />sizing (Council minutes 12/1/82). The estimated cost of oversizing, <br />$55,000, is well within the allocated funds. <br />.ACTION REQUIRED: Award of construction contract to Sabine Consolidated pending <br />receipt of ($184,773.20) to be deposited in escrow. <br />ALTERNATIVES: Award contract for construction of an 8-inch water main as per <br />utility extension agreement. <br />RECOMME"dDATION: Staff concurs with the recommendation by H. Carlos Smith Engineers <br />and Surveyors to award the contract for the construction of a 12" <br />A.C. water line (Alternate 3) to Sabine Consolidated pending receipt <br />of the escrow amount by TCDC. Total contract amount of $249,722.75 <br />plus an estimated $12,000 extra work items. <br />EXHIBITS: Bid Tabulation and Letter of Recommendation from H. Carlos Smith <br />Engineers & Surveyors <br />SUBMITTER: John Joerns <br />~~ <br />~~' <br />Joh~~oerns <br />~J/sc <br />
The URL can be used to link to this page
Your browser does not support the video tag.