My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-03-02 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-03-02 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
7/31/2025 10:37:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/2/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.. <br /> <br />e <br /> <br />. <br /> <br />Cost Estimate to Provide <br />Service to Tooney's Only! <br /> <br />180 LF 611 Sanitary Sewer 8-10' depth 10.00 LF 1,800.00 <br />1 Ea Standard Manhole 0-8' depth 1,500.00 Ea 1,500.00 <br />3 VF Extra depth manhole 100.00 VF 300.00 <br />100 LF Bore & Encase 6" Sanitary Sewer <br /> 8-10' depth 45.00 LF 4,500.00 <br />310 LF 611 Sanitary Sewer at 6-8' depth 7.50 LF 2,325.00 <br />1 Ea Standard cleanout assembly 250.00 Ea 250.00 <br /> $10,675.00 <br /> 10% Contingency $11,742.50 <br /> plus standard tap fees <br /> <br />Practically speaking the above extension should be <br />figured as an 8" sanitary sewer in order to serve <br />the existing businesses at the Northwest corner of <br />the intersection. This would raise the cost to <br />approximately $14,575.00 including a 10% contingency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.