Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />~--.:.: <br /> <br />"t:.:' ""',..~........." <br /> <br />'I <br /> <br />.C1'lY OF IA PaRlE <br />MFMJRANDtM <br /> <br />DAm OF MEETlNG: <br /> <br />(Next) <br /> <br />AGENDA rrEM: Water Well #5 (25th Street) <br /> <br />ORI~ BY: Jerry L. Hodge, Director of Public Works <br /> <br />PROJECT SUMMARY: Extraction of downhole column shaft and replacement of shaft bearings <br />as needed, and check downhole turbine pump and bowls and repair/replace <br />as needed. <br /> <br />FISCAL SUMMARY: Expected to last ten (10) years. Approximate cost of $12,000.00. <br />Funds required from water contingency fund. <br /> <br />ACTION REQUIRED: Council vote <br /> <br />ALTERNATIVES: Without repair the bearings will seize and cause extensive and more <br />expensive damage to the downhole pumps and shaft. <br /> <br />RECOMMENDATION: Permit Layne Texas Water Well Company to complete the work needed prior <br />to summer water demand. <br /> <br />EXHIBITS: Memo from Water/Wastewater Superintendent. <br /> <br />SUBMITTER: Jerry L. Hodge <br />