Laserfiche WebLink
~._. , <br />• • <br />CTTY OF LA PORTS <br />r~'DRADIDi~i <br /> <br />RAZE OF 1rF.ETING: February 23, 1983 <br />ACEr1AA TTFM: <br />ORIGIl~IATED BY: Public Works <br /> <br />P'ROJECt StM~fARY: Proposal to construct street using gypsum by product as base material. <br />Lime subgrade and two-course penetration to be furnished by City. Mobile will <br />supply base material and labor to construct. Streets selected are unpaved at this <br />time. <br />FISCAL St&1+~1ARY: <br />Total Project Cost $150,623 <br />Less cost of base material <br />and labor paid by others 100 000 <br />TOTAL COST TO CITY 50, 23 <br />A~CI'ION REQUIRED <br />Council approval of test and purchase of materials for subgrade and <br />wearing surface. <br />~,~TI~,S; Reject proposal and pave conventionally with City funds. <br />RECONML'BIDATION• Accept proposal as submitted. <br />EXHIBITS: <br />Attached <br />Jerry Hodge <br />• <br />