Laserfiche WebLink
<br />• <br />r~=' <br />ITEM: RECONSTRUCTION OF <br />NORTH WALL <br />Follis <br />,Constructi n Co. <br />SEALED BID ~~0003 <br />1. Total of all labor and $90,872.00 <br />material for the recon- <br />struction of the North Wal , <br />interior 'and exterior, and <br />repair of the air condi- <br />tioning system. <br />2. Alternate Bid: Extension $17,400.00 <br />of gypsum board to deck <br />in all other exterior wal s <br />of City Hall. <br />3. Estimated Completion Time 90 Days <br />in Days <br />t.! - a2-~ <br />J- <br />_. <br />~-- <br />