Laserfiche WebLink
• <br />L� <br />THE LAMMERS PARTNERSHIP <br />•ARCHITECTS S PLANNERS A.I.A. <br />OAAWEA SOO 780 E. TEXAS AVE. <br />■AYTOWN. TEXAS 778S0 C 712 ) 427-1737 <br />July 11, 1983 <br />Mr. Jack Owen <br />City Manager <br />City of La Porte, Texas <br />P.O. Box 1115 <br />La Porte, Texas 77571 <br />Re: La Porte Fire Station Expansion <br />Dear Mr. Owen: <br />The results of the bid opening on the Fire Station Expansion are as follows: <br />Chatham Construction <br />Base Bid $195,000.00 <br />Alt. <br />1 <br />No Bid <br />Alt. <br />2 <br />8,017.00 <br />Alt. <br />3 <br />3,897.00 <br />Alt. <br />4 <br />( 700.00) <br />Days <br />150 <br />Coastal Construction, Inc. <br />$249,000.00 <br />4,830.00 <br />26,000.00 <br />7,000.00 <br />No Bid <br />150 <br />Alt. #1 - Carpet in existing fire station. -Offices and lobby <br />Alt. #2 - New door and windows in existing fire station east side <br />Alt. #3 - New room finishes coffee bar and storage room at existing station <br />Alt. #4 - Electrical service to be overhead in lieu of underground <br />Prior to the bid date, six (6) General Contractors had picked up the plans and <br />were bidding the project. Three (3) of these Contractors called to inform me <br />that they had just been awarded other contracts that stretched their bonding <br />capacity to the limit and would not be able to bond this job. Originally, <br />I had expected six (6) bids, however, I am satisfied with the two (2) received <br />based on my previous experiences with both the bidders. <br />• <br />