My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-10-26 Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1983
>
1983-10-26 Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:58 PM
Creation date
7/31/2025 10:38:12 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/26/1983
Sticky Note
ID:
1
Text:
Original has a black border
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />. . <br /> <br />TurnerCqllie0Braden Inc. <br /> <br />July 29, 1983 <br />Mr. Jerry L. Hodge <br />City of La Porte <br /> <br />Page Six <br /> <br />The switchgear contained in the room includes a 37.5 KVA <br />transformer, a 75 KVAR capacitor, the main distribution <br />panelboard, motor control center A and the main fighting <br />panel. Motor control center A contains a 15 KVA trans- <br />former, four size 4 motor starters, twelve size 2 motor <br />starters, and some smaller equipment. Four size 2 motor <br />starters are proposed to be added in the future. <br /> <br />We have calculated a heat gain of 12,200 BTUH in the <br />electrical switchgear room due to the equipment contained <br />in this area. when the outdoor ambient temperatures are <br />high, the heat gain in the switchgear room is enough to <br />cause thermal overloading of the motor starters in motor <br />control center A. Unless the heat generated by the switch- <br />gear is ventilated, it can be expected that there will be <br />some problems with nuisance tripping during summer months <br />or unusually hot days. In order to prevent this problem, <br />it will be necessary to provide same form of positive <br />ventilation for the switchgear room. <br /> <br />We have checked the existing air conditioning unit for the <br />op~rations building to determine if it would be possible <br />to~dd the electrical switchgear room to the system. <br />Unf~rtunately, the addition of the calculated heat gain to <br />the existing air conditioning load would create a total <br />heat gain that exceeds the capacity of the system by 27 <br />percent. Therefore, this is not a viable solution. <br /> <br />We have evaluated two other possible solutions. The first <br />solution would be to seal the wall between the storage and <br />switchgear areas, louver the exterior doors and install a <br />2300 cfm roof mounted exhaust fan. The second solution <br />would be to install two 2300 cfm roof mounted exhaust fans <br />and replace two of the windows in the storage room with <br />louvers. In either case, the fans should be two-speed <br />with double set-point thermostat control. <br /> <br />We recommend that the second solution be implemented, <br />i.e. install two roof-mounted exhaust fans. This will <br />permit ventilation of the storage area as well as the <br />switchgear room, and will have the added benefit of <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.