Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Turner Collie (6 Braden Inc. <br /> <br />october 10, 1983 <br /> <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br /> <br />Attention: Mr. Jerry Hodge <br /> <br />Re: Sewage Treatment Plant Improvements <br />Waste Sludge Pump Station <br />Turner Collie & Braden Job No. 13-02000-005 <br /> <br />Gentlemen: <br /> <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAY <br />713 78().4100 <br />TELEX 774185 TCB HOU <br /> <br />The construction cost estimate for the proposed waste sludge <br />pump station is attached. The total estimated cost of these <br />improv~ents is $29,900, including engineering design and <br />construction phase services. <br /> <br />The contract documents, technical ~pecifications and con- <br />struction drawings will be completed and ready for City <br />approval on October 19, 1983. The project should be advertised <br />from October 25 to November 15, and bids will be received on <br />November lG, 1983. The estimated time of construction is GO <br />days after award of contract. <br />1. <br /> <br />Please call if you need any additional information. <br /> <br />Very truly yours, <br /> <br />r;wC~ <br /> <br />Robert C. Reach, P.E. <br /> <br />RCR: If <br />Attachment <br /> <br />cc: Jack OWen <br />Jolin Joerns <br /> <br />" <br />~1I8iULTING ~1\l~INEERS . TEXAS AUSTINIOAllAS/El PASO/HOUSTON/PORT ARTHUR COLORADO DENVER/GRAND JUNCTION <br />