My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-03-14 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-03-14 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/14/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.• <br />1.0 Genera] DeacriptTbn: <br />• <br />The scope of this project will be installation of two (2) parallel (in <br />the •ame trench) pipelines for non-flammable gaseous nitrogen service at 465 <br />psig initial operating pressure, n on-flammeble gaseous oxygen service at 350 <br />psig initial operating pressure. All lines will be hydrostatically tested and <br />rattd for 720 psig maximum •llawable operating pressure, each briefly <br />described bclov. <br />1.1 One (1) 16" O.D. oxygen pipeline and one (1) 16" O.D. nitrogen <br />pipelinc, each approximately 157,700 linear feet will originate at a <br />tie-in point approximately 6500 feet rest of U.C.C. Linde LaPorte plant <br />property and approximately 800 feet north of Hwy. 225 in the Exxon <br />saytovn-Bayport pipeline corridor, south within Exxon and Friendswood <br />corridors to Red Bluff Point area, across Galveston Bay, and then south <br />to terminate at U.C.C. S 6 I plant in Texas City approximately 3200' <br />south of Hwy. 348 and just east of Hwy. 146. <br />2.0 Legal Name and Address of Licensee: <br />Union Carbide Corporation <br />Old Ridgebury Road <br />Danbury, CT 06817 <br />n <br />LJ <br />3 0 Applicable Codes of Design and Construction: <br />ANSI B31.8, N2 b 02 Pipeline Design <br />AREA Part S, Pipelines on Railroad R.O.W. <br />API 1104 - Welding and Inspection <br />AP1 SLX - Carrier Pipe Material <br />MACE RP-O1-69 - Cathodic Protection <br />API 1102 - Recommended Practice for Pipeline Crossing Highways and <br />Rail roads. <br />4.0 Carrier Pipe Specification and Design: <br />4.1 Material <br />4.1.1 16" O.D. x .219" Wall, API-SLX, Grade X-60, ERi+', Carbon <br />Steel Pipe <br />4.1.2 16" O.D. x .250" Wall, API-SLX, Grade X-60, ERW, Carbon <br />Steel Pipe <br />4.1.3 16" O.D. x .281" Wall, APY-SLX, Grade X-60, ERW, Carbon <br />Steel Pipe <br />4.2 ANSI 831.8 Deaigr Conditions <br />Class Location 3, Type "C" Construction <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.