My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-03-14 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-03-14 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:29 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/14/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3100 WESLAYAN SUITE 350 HOUSTON, TEXAS 77027 7131621-5373 <br />February 1, 1984 <br />Mr. Jerry Hodge, Director <br />City of La Porte <br />Department of Public Works <br />P. 0. Box 1115 <br />La Porte, Texas 77571 <br />Reference: Hurricane Damage Repair <br />Public Works Facilities <br />Dear Sir: <br />Thank you once again for considering GADDY & PAUL INC for additional <br />consulting engineering services. Enclosed is our brochure for your <br />use. <br />• We understand our assignment would consist of the repair and /or <br />replacement of those items at the Public Works Facility which received <br />hurricane damage and some items which are not hurricane related but <br />require immediate attention. The scope of work may be broken down as <br />follows: <br />1. Vehicle Storage Shed (19' eave height) <br />Repair at foundation and replacement of building structure, <br />including the necessary electrical work. <br />2. Public Works Building <br />a. Repair of door frame at north second floor entrance, repair <br />of window frame at the south wall of the coffee bar, repair <br />of the north wall of the second floor conference room, and <br />repair of the fascia siding at the west main entrance. <br />Replacement of damaged ceiling the can be included; however, <br />you may wish to handle this with your own forces. <br />b. Investigation and strengthening of the second floor above the <br />Parts Department. <br />c. Installation of missing steel columns and repair of the masonry <br />wall at the side of the Parts and Receiving area. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.