My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-03-21 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-03-21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/21/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'. ~. <br /> <br />• 2 <br />5. Another method to prevent outside damage would be to install 6" thick <br />steel reinforced concrete slab in the drainage ditch. This slab would <br />cover the width of the drainage ditch extending two feet on both side of <br />pipeline and approximately one foot above the pipeline. On crossing <br />where ditches are not needed and concrete curb may or may not inplace <br />then the concrete slab will be installed in 10 feet section to the right of <br />way line. <br />• 6. Added wall thickness of pipe may give some addition to safety but <br />normally does not prevent accidents. <br />If approved the Gulf Oil Corporation 6" pipe replacement across City of <br />LaPorte streets and roads will be bored and pulled using concrete coated line <br />pipe cathodically protected with magnesium anodes without casing. <br />• <br />R/W DEPARTMENT <br />FEBRUARY, 1984 <br />D. B. CURRIE <br /> <br />L7 /'7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.