My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-04-06 City Council Regular Meeting Back up Material
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-04-06 City Council Regular Meeting Back up Material
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:38:43 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/6/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />. <br /> <br />e <br /> <br />e <br /> <br />~- <br /> <br />, <br /> <br />H. CARLOS SMITH <br /> <br />ENGINEERS AND SURVEYORS, INC. <br />71 B SOUTH BROADWAY <br />P. O. BOX M <br />LAPORTE, TEXAS 77571 <br /> <br />8 April, 1983 <br /> <br />PHONE AlC 713 471.4226 <br /> <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77571 <br /> <br />~ <br /> <br />Attn: Mr. Jerry Hodge <br />Director of Public Works <br /> <br />Re: Street Paving & <br />Drainage Improvements '. <br />Job No. 1565-82 <br /> <br />Dear Jerry: <br /> <br />In reply to your request, we have estimated the cost of <br />the improvement of Monument Road, as per the specifications <br />of the contract on the above referenced job with McKey <br />Construction & Equipment, Inc. We estimate th~ cost, <br />including engineering at $51,500.00. We would have to <br />be authorized to prepare the plans as soon as possible <br />to be able to add this to the contract. <br /> <br />For the preperation of the subgrage and lime stabilization <br />of the sub grade on Deaf Smith Road and Santa Anna Lane, <br />we have been advised by McKey Construction that an additional <br />$0.36 per square yard would be necessary for the preperation <br />of the subgrade, with the unit price as bid for the lime <br />~ stabilization of $1.92 per square yard to apply for this <br />item. It is estimated that the costs would be: <br /> <br />Deaf Smith Road <br />Santa Anna Lane <br /> <br />$ 15,200.00 <br />7,600.00 <br /> <br />The total for all three of these additions would be $74,300.00. <br />based on estimated quantities. <br /> <br />This is some what less than 20% of McKey's total bid of <br />$405,610.73, and would be within the provisions of the <br />contract. <br /> <br />Please advise uS as soon as possible if this is approved. and <br />get us a letter of authorization so that we may prepare the <br />plans as quickly as possible. <br /> <br />V~ry truly yours. <br /> <br />H. r:arlos <br />President <br /> <br />Engine~;:~rveYors. <br />~7-t, I <br />.... <br /> <br />Smith, P.E. <br /> <br />Inc. <br /> <br />H. ~arlos Smith - <br /> <br />-~// /;/ /' <br />;,.~ {'.;-.( t/~ <br /> <br />H-,~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.