Laserfiche WebLink
<br />. <br /> <br /> <br />e <br /> <br />CITY OF LA PORTE e <br />INTER-OFFICE MEMORANDUM <br /> <br />DATE: ~~rch 27, 1984 <br /> <br />TO: Jack Owen <br /> <br />FROM: J.L. Sease <br />SUBJECT: <br /> <br />PARKING AREA IN REAR OF NEW FIRE ADMINISTRATION BUILDING <br /> <br />When construction originally was planned, the existing slabs were to be left <br /> <br />in place. However, the contractor selected, removed the slabs which gave us a better <br /> <br />building. Doing this removed concrete which should have been in the parking area. <br /> <br />Also, the sewer line to the old section was not where originally thought. This <br /> <br />required removing more of the old asphalt topping. A total of approximately one third <br /> <br />of the parking area is now untopped soil. <br /> <br />After careful consideration we feel that the best choice is to concrete the <br /> <br />entire area. The estimated cost would be twelve to fifteen thousand dollars. <br /> <br />If the City cannot find excess funds to cover this, the Fire Department has <br /> <br />funds budgeted for some items that could be put off until the next budget. <br /> <br />If it is thought that this is an excessive amount to spend, the next alternative <br /> <br />would be to purchase the materials for approximately eight thousand dollars ($8,000) <br /> <br />and the Fire Department will pour the slabs in sections. <br /> <br />The building contractor presented a cost of fourteen thousand dollars ($14,000), <br /> <br />but I feel this can be lowered by bidding the job. <br /> <br />/~ <br />J.L. Sease <br />