My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-07-18 Regular Meeting (2)
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-07-18 Regular Meeting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:18 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/18/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•1 <br />~ • <br />~. n <br /> <br />EXHIBIT A to GENERAL PROVISIONS attached to <br />LETTER AGREEMENT BETWEEN OWNER AND ENGINEER <br />FOR PROFESSIONAL SERVICES, dated <br />October 10 , 19 83 <br />r 1 <br />LJ <br />FURTHER DESCRIPTION OF BASIC ENGINEERING SERVICES AND RELATED MATTERS <br />1. This is an exhibit attached to and made a part of the General Provisions <br />attached to Letter Agreement dated October 10 , <br />19 83 , between City of La Porte (OWNER) and H. Carlos <br />Smith, Engineers & Surveyors, Inc. (ENGINEER) providing for <br />professional engineering services. The Basic Services of ENGINEER as described <br />in Section 1 of the said General Provisions are amended or supplemented as indi-: <br />cat'ed below and the time periods for the performance of certain services as indi- <br />cated in said General Provisions are stipulated as indicated below. <br />2. STUDY AND REPORT PHASE: Not applicable <br />3. PRELIMINARY DESIGN PHASE: <br />The Preliminary Design Phase Services will be completed and ENGINEER's document- <br />ation and opinion of costs submitted within 45 calendar days following written <br />authorization from OWNER to ENGINEER to proceed with that phase of services, <br />• <br />providing for lost time, due to inclement weather. <br />4. FINAL DESIGN PHASE: <br />The Final Design Phase Services will be completed and Contract Documents and <br />ENGINEER's opinion of costs submitted within 15 cal ender days following written <br />authorization from OWNER to ENGINEER to proceed with that phase of services. <br />5. BIDDING OR NEGOTIATING PHASE: No Amendments <br />6. CONSTRUCTION PHASE: Def in it ion: Shop Drawings - All drawings, diagrams, <br />illustrations, brochures, schedules and other data which are prepared by <br />• CONTRACTOR, a Subcontractor, manufacturer, supplier or distributor and which <br />illustrate the equipment, material or some portion of the Work. <br />~l~ <br />" Page 12 of 13' <br />
The URL can be used to link to this page
Your browser does not support the video tag.