Laserfiche WebLink
~ y ~ • <br />i <br />A RESOLUTION REQUESTING THAT THE COASTAL INDUSTRIAL WATER <br />AUTHORITY PREPARE A SCOPE AND COST SURFACE WATER SUPPLY STUDY <br />FOR SOUTHEAST HARRIS COUNTY AND PORTIONS OF GALVESTON COUNTY. <br />WHEREAS, the City desires to investigate a perman- <br />ent solution for its future water needs; and, <br />WHEREAS, a preliminary study must be made to deter- <br />mine the viability of each city's pa.rticipation.in an area- <br />wide plan; and, <br />WHEREAS, representatives of the Coastal Industrial <br />Water Authority will request permission from their board of <br />trustees to prepare a scope and cost surface water supply <br />study for Southeast Harris County and portions of Galveston <br />County, if area Cities show interest; NOW THEREFORE; <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />(Name of City) •Texas requests that CIWA <br />prepare a scope and cost surface water supply study for South- <br />east Harris County and portions of Galveston County. <br />PASSED, APPROVED AND ADOPTED THIS THE <br />day of <br />A.D., 1984. <br />(Signature of Piayor) <br />(Typed Name of I~layor) MAYOR <br />OF THE CITY OF (Name of City) <br />Texas <br />ATTEST: APPROVED: <br />(Signature of City Secretary) (Signature of City Attorney) <br />(Typed Name of City Secretary) (Typed Name of City Attorney) <br />CITY SECRETARY CITY ATTORNEY <br />CITY OF (Name of City) ~ CITY OF (Name of City) <br />Texas Texas <br />