My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-07-30 Public Hearing
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-07-30 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:22 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/30/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />V <br />TurnerCollie~Braden Inc. <br />April 17, 1984 <br />Mr. Jerry Hodge <br />Director of Public Works <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br />Re: Survey Needed for La Porte Airport <br />Dear Jerry: <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAY <br />713 780-4100 <br />TELEX 774185 TCB HOU <br />As you know, we have plotted the airport .boundary and located <br />the leases and facilities, as best we could, from miscellaneous <br />descriptions provided. The problems we ran into included re- <br />ferences to a bench mark that is buried somewhere in a boulevard, <br />lack of any definable ties and descriptions that don't close. <br />It would be in the City's best interest to have some survey work <br />performed to bring in some control and pin things down. Esti- <br />mated cost for the suggested work is: <br />Basic Boundary $ 7,600 <br />(fence ties, pipeline, etc.) <br />Leases ~ 5,000 <br />RW/TW 2,150 <br />TOTAL ~ $14,750 <br />Basically, the descriptions and ties. presently available just <br />don't adequately tell the City what is there and where. <br />Please talk this over and see if you agree that the survey should <br />be performed. If you need more information, give me a call. <br />Very truly ours, <br />/rYtti. <br />James R. Adams, P.E. <br />Project Director <br />JRA/dr <br />cc: Mark Hardy <br />Larry Gaines <br />CONSULTING ENGINEERS • TEXAS AUSTIN/DALLAS/EL PASO/HOUSTON/PORT ARTHUR COLORADO DENVER/GRAND JUNCTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.