Laserfiche WebLink
<br />1 January 1984 <br />• <br />Woodward•Clyde Consultants <br />• ~ ~ • <br /> SCHEDULE OF FEES -FIELD <br />MOBILIZATION AND <br />TRANSPORTATION Drill rig, water truck <br />Drayage, Permits for equipment $ 3.00/mile <br />C <br /> ost + 1596 <br />SOIL BORINGS Soil Borings, truck mounted rigs on land <br /> 0-75' samples at S ft intervals $ 9.25/foot <br /> Over 75' samples at 5 ft intervals $11.50/foot <br /> Over 75' samples at 10 ft intervals $10.50/foot <br /> Over 150' <br />0-15' continuous sampling On Request <br />$12.00/foot <br /> 15-50' continuous sampling $14.25/foot <br /> SO-75' continuous sampling $15.50/foot <br /> Osterberg or Pitcher Sampling surcharge 27.50/sample <br /> Wash or Auger Borings ~ 7.00/foot <br /> Hourly Drilling Rate (no footage charge) <br /> Truck <br />Hourly Drilling Rate (no footage charge) $95.00/hour <br />ROCK CORING Continuous NX cores, 0-100' $115.00/hour <br />On Request <br /> Replacement of lost casin and bits <br />g Cost + 1596 <br />INSITU TESTING Field Vane Shear Test, 0-SO' <br />$87.50/test <br />• Menard Pressuremeter Tests <br />WCC Cone Penetration Tests On Request <br /> Dutch Cone Penetrometer On Request <br />On Request <br />OTHER CHARGES Setting and removing casing <br />$ 6.00/ <br />foot <br /> Standby of crew and equipment, and . <br /> moving time in excess of 1/2 hr/boring $85.00/hour <br /> Rental of special •equipment for access <br />Surveying Cost + 1596 <br /> <br />Drilling mud and additives below 200 ft Cost + 1596 <br />Cost + 1596 <br /> Marsh equipment rental Cost + 1596 <br /> Per diem allowance for crews Cost + 1596 <br /> Inclinometers and static level piezometers <br /> (minimum charge $150.00 ea) <br />Pick up truck On Request <br /> $35/day + $0.35/mile <br />Sampling 'tubes destroyed during Sample <br /> Removal Cost + 1596 <br />NOTES Prices for items not described above will be furnished on request. <br /> Right of entry to exploration sites must be provided by the client <br />unless other arrangements are agreed upon. <br /> Restoration of site required by the client will be billed additional to <br />the above rates if performed by us. <br /> Overtime in excess of 8 hours per day, Saturda <br />' y, Sunday or holidays <br /> <br />• at client <br />s request charged at $12.50/hour in <br />rates shown above. Drilling will be surcharged addition to standard <br />$3 <br />00/ft wh <br /> <br />equipment is required or drilling is over water. . <br />en marsh <br /> Surcharge foc drilling in contaminated material On Request <br />H-3 <br />